Rehabilitation & Construction of Carpet Road from Badoratta to Rata Goraya via Mari Bhindsan and More
Punjab Highway Department
| Type: | Tender Notice |
| Reference: | Express Newspaper |
| Bid Opening Date: | December 31, 2025 |
| Bid Expiry Date: | January 01, 2026 |
Punjab Highway Department
Tender Notice
The Punjab Highway Department invites bids from qualified engineering firms and contractors registered with the Pakistan Engineering Council (PEC) for the financial year 2025-26. Bidders must participate through the PPRA E-Tendering System and comply with the following terms and conditions:
Eligibility & Registration:
-
Contractors/Firms must be registered on the Punjab PPRA website: www.punjab.eprocure.gov.pk. Detailed instructions regarding registration are available at ppra.punjab.gov.pk/e-procurement.
Bid Security:
2. As per Clause 27 of PPRA Rules 2014, all bidders must upload earnest money in the form of CDR or Pay Order in favor of Executive Engineer, Road Construction Division, Gujranwala, equal to 5% of the estimated cost/DNIT cost. Bids must be submitted on the PPRA portal by 31st December 2025, 1:00 PM. The original CDR/Pay Order must be submitted one hour before bid opening, or the bid will be disqualified.
Performance Guarantee:
3. As per Clause 56 of PPRA Rules 2014, the lowest evaluated bidder shall submit a Performance Security of 5% of the bid amount within 15 days of receiving the award letter. Acceptable forms include CDR, Bank Draft, Cashier Cheque, Pay Order, or Bank Guarantee. The guarantee must remain valid for three months beyond the project completion date.
Bid Submission & Rates:
4. Bidders must quote item rates and total amounts for each item as well as the grand total. Bids quoting percentages above or below the approved cost will not be accepted.
-
After bid submission, contractors may attend the Office of the Superintending Engineer, Highways Circle, Gujranwala, on 31st December 2025 at 2:00 PM, where the bids will be retrieved and the quoted rates announced in the presence of the Tender Opening Committee.
Compliance & Disqualification:
6. Submission of false documents or information, such as fake CDRs, receipts, or PEC credentials, will result in disqualification and blacklisting. The matter will also be reported to PPRA and PEC for further action.
-
The procuring agency reserves the right to reject all bids at any time prior to acceptance, as per Clause 35 of PPRA Rules.
Project Execution:
8. Rigid pavements will be laid using a concrete batching plant and concrete paving machine.
9. TST/DST and surfacing will be executed via a mechanized system.
10. Credit recovery for old material will be adjusted manually during bid evaluation.
Submission:
11. All bids must be submitted electronically through the PPRA portal.
12. The official PPRA website is http://eproc.punjab.gov.pk/ViewTender.aspx. Response time is counted from the date of advertisement publication.
Tender Details:
| Name of Work | DNIT/Letter | Estimated Cost (PKR M) | Completion Time | Bid Security (PKR M) | District |
|---|---|---|---|---|---|
| Rehabilitation & Construction of Carpet Road from Badoratta to Rata Goraya via Mari Bhindsan, including Link Road Kohlowala Daburji Virkan Khan Musalman Bypass, L=19.50 Km | CE(N) No. 1901/Ple, dated 11.12.2025 | 752.583 | 12 Months | 68.625 | Gujranwala |
| Madan Chak via Aulakh Bhaiky, Godha and Kot Keshu, L=16.00 Km | CE(N) Letter dated 11.12.2025 | 315.583 | 12 Months | 31.583 | Gujranwala |
Contacts:
-
Executive Engineer, Road Construction Division, Gujranwala
-
Superintending Engineer, Highways Circle, Gujranwala
Download Back
Related Tender
- Rehabilitation & Construction of Carpet Road from Badoratta to Rata Goraya via Mari Bhindsan and More
Published Date: December 14, 2025 - Establishment of 03 High Impact IT Labs in FDE Schools – Technology Upgradation in Public Schools/Colleges to Support Learning
Published Date: December 14, 2025 - Supply, installation, commissioning, and maintenance of Genetic Lab Equipment (Package No. 20, Lot-B; Real Time PCR).
Published Date: December 14, 2025 - Provision of Janitorial and Security Services
Published Date: December 14, 2025 - Construction & Reconstruction / Improvement of Road from Raseer Karam Kay, Salam Kay UG Link Union Council
Published Date: December 14, 2025 - Revamping / Re-construction of Existing Dispensaries and MCH Centers in District Mandi Bahauddin
Published Date: December 14, 2025 - Development of Community School at New Campus and More
Published Date: December 14, 2025 - Revamping/Reconstruction of Existing Dispensaries and MCH Centers and More
Published Date: December 14, 2025 - Laptops & Desktops and Miscellaneous Hardware
Published Date: December 14, 2025 - Supply and installation of machinery and equipment
Published Date: December 14, 2025 - Procurement of Windows Operating System Datacenter Edition
Published Date: December 13, 2025 - Revamping / Reconstruction of existing Dispensaries and MCI Centers across Punjab (District Hafizabad)
Published Date: December 13, 2025 - Development, excavation, loading, and transportation of rock salt
Published Date: December 13, 2025 - Hiring of Head-Hunting Firms/Companies for Recruitment of Professionals
Published Date: December 11, 2025 - Procurement of Fresh Food Items – Framework Contract for FY 2025–26
Published Date: December 11, 2025 - Revamping of Non–24/7 Basic Health Units (BHU) Across Punjab – District Narowal and More
Published Date: December 08, 2025 - Special repair of road from Vanjan to Gardari Wala (Length: 4.50 km, Reach: Km 0.00 to 1.00), Tehsil Isa Khel, District Mianwali
Published Date: December 08, 2025 - Collaboration / Joint Venture for Certified Seed Potato Production
Published Date: December 08, 2025 - Third-Party Annual Assessment and Verification of IESCO’s Five-Year Investment Plan for the period FY 2023-24 to FY 2027-28
Published Date: December 08, 2025 - Black Leather Oxford-Style Shoes (With Toe) and More
Published Date: December 04, 2025 - Beautification/Rehabilitation of Green Belt from Tehsil Chowk to Sargodha Road Bypass, Chiniot and More
Published Date: December 04, 2025 - Revamping of Remaining/Leftover 24/7 BHUs, District Chiniot – Phase III (ADP No. 414 for 2025–26) and More
Published Date: December 04, 2025 - Hiring of Vehicles on Rent
Published Date: December 04, 2025 - Anise Parking, Toll Tax, Slaughterhouse Fee and More
Published Date: December 04, 2025 - Special repair to existing snag dead end at Missan Kallar Railway Station on SDR–SLL Section and More Work
Published Date: December 04, 2025 - Addition/Alteration in Minister’s Residences in GOR-I, Lahore (12/B Aikman Road) and more Work
Published Date: December 04, 2025 - Tender Notice for Hiring of Vehicles
Published Date: November 26, 2025 - Repairing Chief Engineer D&F Zone at Thoker Niaz Baig, Lahore
Published Date: November 26, 2025 - Framework Contract for the Purchase of Lab Kits & Reagents for Sahiwal Medical College and Allied Institutions
Published Date: November 26, 2025 - USF Next Generation Optical Fiber Network & Services – Small Lot Project (FY 2025-26)
Published Date: November 26, 2025