Repair & Maintenance of Roads, LDA Lahore
Lahore Development Authority UD Wing Lahore
Type: | Tender Notice |
Reference: | Government Institutions |
Bid Opening Date: | May 21, 2025 |
Bid Expiry Date: | May 22, 2025 |

Lahore Development Authority (LDA) invites e-tenders from eligible engineering firms and contractors for the following development schemes. Bidding will be conducted under the Single Stage – One Envelope procedure, as per PPRA Rule 38(1).
Interested firms must be registered with the Pakistan Engineering Council (PEC) in the required category, be active taxpayers (NTN and PNTN), and registered on the EPADS system of the Punjab Procurement Regulatory Authority (PPRA).
List of Works
Sr. No. | Name of Work | Estimated Cost (PKR) | Bid Security (5%) | Time Limit | PEC Category | Submission Deadline | Opening Date & Time |
---|---|---|---|---|---|---|---|
1 | Repair & Maintenance of Road Link – Bedian Road near Nawaz Sharif Interchange, Lahore | 4,920,320 | 246,016 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
2 | Repair & Maintenance – Sadowala Road Link Bark Road, Lahore | 4,814,327 | 240,716 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
3 | Repair & Maintenance at LDA School System (Boys), Allama Iqbal Town, Lahore | 4,938,410 | 246,921 | 60 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
4 | Extension of Divider at Main Garden Town Road (Traffic Circle), Model Town, Lahore | 4,220,785 | 211,039 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
5 | Extension of Divider at WASA Drain near Arfa Tower & Model Town Chowk, Ferozepur Road | 3,542,196 | 177,110 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
6 | Repair & Maintenance of Road – Model Town Extension, R-Block, Lahore | 4,635,375 | 231,789 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
7 | Repair & Maintenance of Road – Shah Di Khol near Jinnah Hospital, Lahore | 4,824,114 | 241,206 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
8 | Repair & Maintenance of Road – Tricon Plaza near Sherpao Bridge, Lahore | 4,513,946 | 225,697 | 30 days | C-6 & above | 21-05-2025, 09:30 AM | 21-05-2025, 10:00 AM |
9 | Repair & Maintenance at LDA Model School (Girls), M.A. Johar Town, Lahore | 4,641,946 | 232,097 | 60 days | C-6 & above | 21-06-2025, 09:30 AM | 21-06-2025, 10:00 AM |
Instructions for Bidders
-
Contractor Registration
-
Firms must be registered on the EPADS portal of Punjab PPRA.
-
Only EPADS-registered contractors with valid PEC licenses can participate.
-
-
Availability of Documents
-
Bidding documents will be available immediately after the tender notice is published on EPADS.
-
Bidders must quote their rates after reviewing the Bill of Quantities (BOQ).
-
-
Bid Submission Requirements
-
Bids must be submitted online via EPADS as per the format (both figures and words) and signed according to tender instructions.
-
Financial proposals must be uploaded as PDF files, in line with Regulation 6(4) of the PPRA Regulations 2024.
-
-
Bid Security
-
Each bid must be accompanied by 5% of the estimated cost in the form of a Bank Guarantee from a scheduled bank in Pakistan.
-
The guarantee must be valid 30 days beyond the bid validity period.
-
The original bid security must be submitted physically before the bid deadline, failing which the bid will be disqualified.
-
-
Other Conditions
-
Conditional bids will be rejected.
-
If the opening date falls on a public holiday, it will be postponed to the next working day.
-
Bids submitted via post or telegraph will not be accepted.
-
Corrupt, unreadable, or virus-infected files will result in disqualification as per Regulation 8(4) of PPRA Regulations 2024.
-
All applicable taxes must be borne by the contractor as per government rules.
-
PPRA Rules 2014 (amended) will be strictly followed.
-
CHIEF ENGINEER-I
Lahore Development Authority (UD Wing)
Download Back
Related Tender
- Remodeling/Widening of Faizabad Interchange, Islamabad
Published Date: May 20, 2025 - Construction of boundary cum fence wall, control house building, electrical equipment foundations, transformer way, switchyard fence, cable trenches, etc.
Published Date: May 20, 2025 - Development and Maintenance Works (MES)
Published Date: May 20, 2025 - Procurement of Language and Speech Lab Tools & Books
Published Date: May 19, 2025 - Filing of Earth in Lawn in Front of Admin Block Regarding Landscaping of Jinnah Campus Kala Shah Kaku, UHS for A&C Department:PUR/25/4025
Published Date: May 19, 2025 - Procurement of furniture, fixtures, and miscellaneous items
Published Date: May 19, 2025 - Procurement of Training Material (Building Painter)
Published Date: May 19, 2025 - Rehabilitation / Improvement of Street (PCC), Sewerage & Drainage
Published Date: May 19, 2025 - Hiring of Firms regarding Provision of Call Response Center Services for Community Empowerment and Strengthening of Healthcare access through Maryam Nawaz Health Clinics (MNHC) for FYs 2024-25 & 2025-
Published Date: May 19, 2025 - Procurement and Installation Of Vinyl (Branding)
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage, and Drainage in Union Council No. UC-264, including Sultankay, Kamas, Dhoop Sari, and surrounding localities in Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation / Improvement of Streets (PCC), Sewerage, and Drainage in UC-266: Areas include Talab Saraiey, Dhoke Manga, Kot Jahania, Wara Khamba, and surrounding localities within Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation / Improvement of Streets (PCC), Sewerage & Drainage in UC-268 (Jodhu Dheer), including Tibba Pajjian Village, Kullay Da Kot, Ladhay Kee Neewein – Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage & Drainage in UC-267 (Baddoki Sani & Manak Village), Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), including Sewerage and Drainage Work in Union Council No. UC-268, Jodhu Dheer, Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), along with Sewerage and Drainage Works in Union Council No. UC-262 (Sunder, Rangeelpur Village, Shamkay Bhattia) – Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage and Drainage in Union Council No. 259, Azmeer Town, Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage, and Drainage Works in Union Council No. UC-274 – Babliana (Remaining Streets of Buchokee Majha), Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage, and Drainage in Union Council No. UC-274, Babliana (Babliana Village & Connecting Links), Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage and Drainage at Union Council No. 274 – Babliana (Habib Kot & Buchokee Pind), Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (P.C.C.), Sewerage & Drainage in UC No. 110 – Niaz Baig, Gulshan-e-Ali Town, Husnain Park & Adjacent Abadies, Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (P.C.C.), Sewerage & Drainage in UC No. 112 – Mustafa Town, Waris Colony and surrounding areas, Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Rehabilitation / Improvement of Street (PCC), Sewerage / Drainage UC- 117,Shah Pur Kanjara in Allama Iqbal Zone MCL.
Published Date: May 19, 2025 - Rehabilitation and Improvement of Streets (PCC), Sewerage and Drainage in UC-256, Ali Raza Bad (Nassirabad, Nawab Town, Abbasabad), Allama Iqbal Zone, MCL
Published Date: May 19, 2025 - Procurement of Fashion Designing Kits for Matric Tech Programme in Public Schools
Published Date: May 19, 2025 - Rehabilitation / Improvement of Streets (PCC), Sewerage / Drainage at Asal Gurukay, UC-191(B), Wahga Zone, Metropolitan Corporation Lahore
Published Date: May 16, 2025 - Rehabilitation / Improvement of Streets (PCC), Sewerage / Drainage at Dogai, Sarja Marja, UC-179(A), Wahga Zone, MC Lahore
Published Date: May 16, 2025 - Construction of Official Quarter at WASA Colony, Nishter Town
Published Date: May 16, 2025 - Local Government & Community Development Department (LG&CD), Sahiwal
Published Date: May 16, 2025 - Lahore Development Authority (LDA), UD Wing - Tender Notice
Published Date: May 16, 2025